Free owner-builder training: the 6 keys to building your own home → (832) 720-7978

How to Hire Subcontractors for Building a House (and Manage Them Well)

Owner-builder and plumbing subcontractor reviewing a scope of work at a job site

This guide contains affiliate links. As an Amazon Associate we earn from qualifying purchases, at no extra cost to you. Learn more.

In this guide
  1. Step 1: Know which trades you need
  2. Step 2: Find good candidates
  3. Step 3: Write a clear scope of work and collect bids
  4. Step 4: Verify licenses, insurance and references
  5. Step 5: Put it in writing
  6. Step 6: Pay smart and collect lien waivers
  7. Step 7: Schedule and communicate
  8. Red flags to watch for
  9. Next steps

If you want to know how to hire subcontractors for building a house, the short version is this: get several bids against a clear written scope, verify licenses and insurance, sign a simple contract, pay only for completed work with lien waivers, and manage the schedule like a hawk. Subs are the people who actually build your home, so the time you spend hiring well pays you back on every phase.

Step 1: Know which trades you need

A typical new home involves a long list of subcontractors. Map them out before you start calling:

  • Site work and excavation
  • Foundation (forms, steel or post-tension, concrete)
  • Framing
  • Roofing
  • Windows and exterior doors (sometimes installed by framers)
  • Plumbing, electrical and HVAC
  • Insulation
  • Drywall
  • Siding, masonry or stucco
  • Cabinets, countertops, trim carpentry
  • Painting, flooring and tile
  • Gutters, flatwork, landscaping and cleaning

Our new home construction timeline shows the order these trades usually arrive.

Step 2: Find good candidates

The best subs often do not advertise much. Ask:

  • Local lumber yards and supply houses, which know who pays bills and shows up
  • Other subs you already trust (good framers know good roofers)
  • Building inspectors, informally, who see everyone's work
  • Neighbors and friends who built recently

Drive by active job sites. A clean, organized site says a lot about a crew.

Step 3: Write a clear scope of work and collect bids

Bids are only comparable if every sub is bidding the same thing. For each trade, write a scope that lists:

  • The plans and specifications the bid is based on
  • Exactly what is included and what is not (materials, permits, cleanup, haul-off)
  • Who supplies which materials
  • Expected start date and duration
  • Warranty terms

Aim for at least three bids per major trade. Compare them line by line. The lowest number often leaves out something the others included.

Pro tip: When two bids are far apart, call both subs and walk through the scope together. You will either find a missing item or learn something about the job you had not thought about. Either way, you win.

Step 4: Verify licenses, insurance and references

Licenses

In Texas, electricians and HVAC contractors are licensed by the Texas Department of Licensing and Regulation (TDLR), and plumbers by the Texas State Board of Plumbing Examiners. Look up the license online and make sure it is active. These trades generally pull their own permits. Many other trades have no state license, so the next two checks matter even more.

Insurance certificates

Require a certificate of insurance before anyone sets foot on site. Look for general liability coverage and, ideally, workers' compensation. Ask to be named as certificate holder, and confirm the policy is current by calling the agent listed. An uninsured worker injured on your property can become your problem, which is one reason owner-builders also carry builder's risk and liability coverage.

References

Call two or three recent customers. Ask whether the sub showed up on time, stayed on budget, cleaned up, and came back for warranty issues.

Step 5: Put it in writing

A simple written subcontract protects both sides. It should include the scope, price, payment schedule, start and completion targets, change order process, insurance requirements, cleanup and warranty. Any change in scope or price should be a signed change order, not a hallway conversation.

Step 6: Pay smart and collect lien waivers

Tie payments to completed, inspected milestones, such as rough-in passed or trim complete. Avoid large up-front payments; a documented deposit for special-order materials can be reasonable. Hold back final payment until punch items are done.

Texas has strict and detailed mechanic's lien laws. Unpaid subs and suppliers can have lien rights against your property even if you paid your contractor, and the statute sets specific notice deadlines, retainage rules and waiver forms. Collect a lien waiver with each payment, using the statutory forms where required. Because these rules are technical and change from time to time, have a Texas construction attorney review your contracts and payment process before you start. This article is general information, not legal advice.

Step 7: Schedule and communicate

Good subs juggle several jobs, so earn priority by being organized:

  • Confirm start dates a week out and again two days out.
  • Have the site ready: previous trade finished, inspection passed, materials on site.
  • Walk the work with the sub at the start and end of their phase.
  • Keep a log of calls, decisions and photos.
  • Pay on time. Nothing builds loyalty faster.

Keep everything in one place with a house-building planner or document organizer for contracts, insurance certificates and lien waivers. A label maker helps keep binders and material staging tidy.

Red flags to watch for

  • Asking for most of the money up front, or cash only with no paperwork
  • No certificate of insurance, or one that cannot be verified
  • Suggesting you skip permits or inspections to save time
  • A bid far below everyone else with no clear explanation
  • Poor communication during bidding, which rarely improves once work starts

When a sub does not work out, document the problem, follow your contract, and get a replacement lined up before you part ways if you can. Pay for work completed and get a final lien waiver.

Next steps

If you are managing your own build, read how to be your own general contractor and set up your budget before requesting bids. Our free training walks through the full owner-builder process, including how to line up your subs.

Frequently asked questions

How many bids should I get from subcontractors?

Aim for at least three bids for each major trade. That gives you a sense of fair pricing and helps you spot a bid that is missing scope or priced unrealistically low.

Should I pay subcontractors up front?

Avoid large up-front payments. Pay against completed, inspected work on a written schedule, and collect a lien waiver with each payment. A modest deposit for special-order materials can be reasonable if it is documented.

What is a lien waiver?

A lien waiver is a signed document in which a contractor or supplier gives up lien rights for amounts that have been paid. Texas has specific statutory waiver forms and strict lien rules, so have a Texas construction attorney review your process.

What insurance should my subcontractors have?

Ask for a certificate of insurance showing general liability, and ideally workers' compensation. Confirm the policy is current with the insurance agent listed on the certificate.

Do subcontractors need a license in Texas?

It depends on the trade. Electricians and HVAC contractors are licensed by TDLR and plumbers by the Texas State Board of Plumbing Examiners. Many other trades, such as framing or drywall, do not have a state license, so references and insurance matter even more.

Written by Jonathon

Founder of New Home Investing Knowledge. Jonathon has spent more than a decade helping Texans plan, build and invest in new homes — including people acting as their own general contractor.

Keep reading

Thinking about building your own home?

Get our free owner-builder mini-course: six short lessons on how to design, budget and manage your build without overpaying a general contractor.

Start the free training