
This guide contains affiliate links. As an Amazon Associate we earn from qualifying purchases, at no extra cost to you. Learn more.
In this guide
A new construction walkthrough checklist helps you catch defects before closing and again before your builder's workmanship warranty runs out, so problems get fixed at the builder's expense instead of yours. Walk the home room by room, test everything that moves, opens, flushes or turns on, and document every issue in writing with photos. Below is the punch list I recommend for both the pre-closing "blue-tape" walkthrough and the 11-month warranty walkthrough.
Understand the two walkthroughs
The pre-closing (blue-tape) walkthrough
This usually happens a week or two before closing. You walk the home with the builder's superintendent or customer service rep and mark defects with blue painter's tape. The goal is a written punch list the builder agrees to complete, ideally before you close. Get a written commitment for anything left open after closing.
The 11-month warranty walkthrough
Many builders provide a one-year workmanship warranty, plus longer coverage for systems and structure. Your warranty document spells out the details, so read it. Around month 11, after the house has gone through a full cycle of seasons, settling and humidity changes show up: drywall cracks, nail pops, sticking doors, grout cracks. Reporting them in writing before the deadline is key.
For a professional opinion, hire a licensed third-party inspector for each stage. In Texas, inspectors are licensed by TREC. Our new construction inspection checklist explains the inspections that happen during the build.
Tools to bring
You do not need a contractor's truck, but a few inexpensive tools make your walkthrough far more thorough.
- Outlet tester: Plug it into every receptacle to check wiring and test GFCI outlets.
- Laser measure: Confirm room dimensions match the plans and check appliance openings.
- Level: Check counters, shelves, windowsills and floors.
- Infrared thermometer: Check that every supply vent blows cool (or warm) air and spot cold or hot areas.
- Moisture meter: Check around tubs, showers, windows and under sinks for hidden moisture.
- Headlamp: For closets, under sinks, the attic hatch and the garage.
- Blue painter's tape, a notepad and your phone for photos.
Exterior and garage punch list
- Grading slopes away from the foundation; no standing water or erosion.
- Gutters and downspouts installed and draining away from the house.
- Siding, brick and stone: no cracks, gaps or missing mortar; caulk at trim and penetrations.
- Roof: no visibly missing, lifted or damaged shingles (look from the ground; leave climbing to the inspector).
- Exterior doors seal properly; weatherstripping intact; locks work with every key.
- Driveway and walkways: note cracks or spalling.
- Hose bibs, exterior outlets and lights work.
- Garage door opens, closes and reverses when its safety sensors are blocked.
- Landscaping, sod and irrigation installed as agreed.
Interior: every room
- Walls and ceilings: Nail pops, cracks, uneven texture, paint drips, missed touch-ups. Look at walls with a flashlight held at a low angle.
- Floors: Scratches, chips, lifted edges, gaps, squeaks and hollow-sounding tile.
- Doors: Open and close without rubbing; latch properly; even gaps; stops installed.
- Windows: Open, close and lock smoothly; screens present; no cracked glass or broken seals (fogging between panes).
- Trim and baseboards: Tight joints, filled nail holes, caulked and painted.
- Electrical: Every switch, light and outlet works; cover plates installed; GFCI and AFCI protection where required.
- HVAC: Every room gets airflow; returns are not blocked; the thermostat responds.
Kitchen and bathrooms
Kitchen
- Cabinets level, doors aligned, drawers glide and close; no chips or scratches.
- Countertops: no chips, cracks or uneven seams; backsplash grouted and caulked.
- All appliances run; model numbers match your selections; range hood vents properly.
- Run the faucet and disposal; check under the sink for drips.
- Dishwasher runs a short cycle without leaking.
Bathrooms
- Run every faucet and shower hot and cold; check pressure and drain speed.
- Flush toilets; make sure they are secure and do not rock.
- Tile and grout complete with no cracks; caulk at tubs and showers.
- Exhaust fans work and vent outside, not just into the attic.
- Shower doors seal and do not leak onto the floor.
Systems, attic and utility areas
- Water heater installed with proper venting, drain pan and relief valve discharge line.
- HVAC unit, filter location and condensate drain; ask for the filter size and installation dates.
- Electrical panel labeled; no missing knockouts.
- Attic insulation evenly spread with no gaps (inspector task if access is limited).
- Smoke and carbon monoxide alarms installed and working.
- Washer and dryer hookups, dryer vent to the exterior, and a drain pan if laundry is upstairs.
Pro tip: Ask the builder to run the HVAC for an hour before your walkthrough. Then use an infrared thermometer at each supply vent. A room that is noticeably warmer than the rest is far easier to fix before closing than after you move in.
How to document issues so they get fixed
- Tape and photograph everything. Take a wide shot showing the room and a close-up of the issue, with the tape visible.
- Write it down by room. Use short, specific descriptions: "Primary bath: grout crack at shower bench, left corner."
- Get the builder's signed list. Ask for a copy of the punch list with completion dates.
- Submit in writing. Use the builder's warranty portal or email, not just a phone call, and keep confirmations.
- Re-walk before closing to confirm completed items, and note anything still open on the closing paperwork or in a written agreement.
- Keep a running list after move-in. Add items as you notice them so your 11-month list is ready.
A home planner or a shared phone note works fine for this. What matters is that every item has a date, a photo and a written request.
Next steps
Schedule your third-party inspection, gather the tools above and print this checklist before your walkthrough. Once you are moved in, our list of first things to buy for a new home covers what to set up first. If you are still early in the process, review the new home construction timeline and the free training.
Frequently asked questions
What is a blue-tape walkthrough?
It is the pre-closing walkthrough of a new home where you and the builder's representative mark cosmetic and functional defects, often with blue painter's tape, so they are fixed before or shortly after closing.
Should I hire an inspector for a new construction home?
Yes. A licensed third-party inspector checks things most buyers cannot, such as attic insulation, roof details, electrical panels and HVAC performance. Many buyers schedule one before the final walkthrough and another before the 11-month warranty walkthrough.
What is an 11-month warranty walkthrough?
Many builders offer a one-year workmanship warranty. Walking the home around month 11 lets you catch settling cracks, nail pops, door issues and other problems and report them in writing before that coverage ends.
How long does a new construction walkthrough take?
Plan on at least one to two hours for a typical home, and longer for larger homes. Do not let anyone rush you; this is your best chance to get issues fixed at the builder's expense.


